Demolition and strip-out in Chambéry.
In Chambéry, the first question is not how to demolish, but what you are allowed to demolish: the historic heart and a wide ring around it are subject to heritage protections that govern every removal visible from the street. 20 minutes from our Aix-les-Bains office, we identify the rules that apply to your building, then our teams carry out the strip-out, the demolition and the work that follows.
Protected sector, AVAP or PLUi HD: locating your address
Three documents share the city. The historic heart has been a protected sector (secteur sauvegardé) since 8 May 1969, with a safeguarding and enhancement plan (PSMV). Alongside it, without overlapping, an area for the enhancement of architecture and heritage (AVAP), created by a resolution of 26 October 2017, became a remarkable heritage site under the law of 7 July 2016. Finally, the inter-municipal local plan of Grand Chambéry (PLUi HD), approved on 18 December 2019 and enforceable since 21 February 2020, applies outside the protected sector; within the AVAP, its rules add to those of the remarkable heritage site.
Within the AVAP perimeter, all work that demolishes or renders unusable all or part of a building requires a demolition permit, issued after the opinion of the ABF heritage architect (Architecte des Bâtiments de France); the processing time there is extended by one month. Elsewhere, the PLUi HD, its annexes and the surroundings of historic monuments set the framework: the AVAP map, its rules and the PLUi HD zoning can be consulted on the Grand Chambéry website.
An internal strip-out that alters neither the façade nor the roof generally requires no planning permission. A nuance specific to the old centre: unlike other heritage plans, a PSMV can protect architectural features inside buildings. In the protected sector, we therefore also check staircases, ceilings and decorative features before removing anything.
Protected building or not: what the AVAP allows
The AVAP map distinguishes protected buildings, shown in red, from the others. For the former, the rules are clear: they are kept and restored, and any demolition or alteration is forbidden. Two exceptions matter for a renovation project: clearance of the interior of city blocks and the removal of ancillary parts added over time, such as a lean-to built in a courtyard.
For an unprotected building, demolition remains possible but must come with a project: treatment of the space freed up and of the ground, of gable walls laid bare and any new openings in them, and planting. The rules also ask that the void created and the rear of the buildings, once exposed, do not face directly onto the street. Any rebuilding then follows the rules for new construction, except identical rebuilding as provided for by the planning code.
In practice, we put together the demolition permit file with the “after” section already drawn, since that is what the ABF heritage architect (Architecte des Bâtiments de France) examines. When the project allows, demolition is included in the building permit application, for example for a project adding a storey or an extension that replaces an addition.
When a removal reveals the building's history
Chambéry has zones where archaeological requirements are presumed. Demolition permit applications located there are presumed to be subject to requirements, and the permit cannot be issued until the regional prefect has ruled on preventive archaeology. These requirements may concern the demolition methods or the nature of the project's foundations.
The same principle applies during the works: a historic feature that appears when render is stripped falls under archaeology legislation. A study then guides the project, either towards reinstating the feature if the façade allows, or towards covering it over after a documentary record has been kept. We build these contingencies into the schedule from the consultation stage, rather than suffering them mid-build.
Stripping out an old apartment in the centre: the method
Old buildings in the centre often combine thick stone walls, timber floors and sometimes vaults. Before removing a partition, we check its real role in the structure: in this type of building, an old partition can relieve a floor. Any opening in a load-bearing wall requires a structural study and, in a co-ownership building, a vote at a general meeting.
Built well before 1997, these buildings require an asbestos survey carried out by a certified assessor before the first hammer blow; old paints may also contain lead. When the survey is positive, the law reserves removal for a certified firm: our teams only step in once the area has been handed back.
Then there is the logistics, often decisive in narrow streets and inner courtyards: rubble brought down in bags by the stairs, small skips and frequent collections rather than one large container, a request to occupy public land when a skip has to stand on the highway, sorting as we go. Once the strip-out is finished, our finishing-trades teams carry on without any change of point of contact.
Hillsides and outskirts: demolishing a house or outbuilding
Outside the centre, the demand changes: demolition of a garage or a dilapidated veranda, of a house to be rebuilt, of an extension to be reworked. On the slopes of Chambéry-le-Haut, Bassens or Jacob-Bellecombette, demolition quickly affects the ground: retaining walls to keep, runoff water to manage, foundations to study before rebuilding. We have the ground survey carried out before demolishing, not after.
The flood risk prevention plan for the Chambéry basin is annexed to the PLUi HD: for an affected plot, it can determine what you will be entitled to rebuild. We check these annexes and your plot's zoning before pricing the demolition, so that the rebuilding project remains possible.
What we handle in Chambéry
From clearing a courtyard to demolishing a hillside house, with the heritage file and the rebuilding in the same assignment.
Courtyard and block clearance
Removal of lean-tos and added extensions, within the framework the AVAP allows for protected buildings.
Stripping out an old apartment
Laying bare homes in the centre while preserving the parquet floors, mouldings and decorative features to be kept.
Opening in a stone wall
Structural study, propping and a bearing beam suited to the thick walls and timber floors of old buildings.
Heritage file
Demolition permit with a project for the space freed up, opinion of the ABF heritage architect (Architecte des Bâtiments de France), archaeological section if necessary.
Outbuilding or house on the outskirts
Garages, verandas, houses to rebuild on the hillsides and in the first ring, ground survey before rebuilding.
Rubble with restricted access
Bags, small skips, collections and occupation of public land: removal is planned before day one.
Towns covered around Chambéry
Regular demolition and strip-out work across Chambéry métropole and the Chambéry basin — for a town not listed, contact us.
Demolishing in Chambéry: answers to common questions
Let's check first
what your building allows.
From our Aix-les-Bains office, 20 minutes away, we come to the site, locate your address within the heritage perimeters and price the demolition item by item. Travel and the first estimate cost you nothing.