Once the floor is laid, nobody sees the levelling compound any more. Yet it is what decides whether the tiles will stay flat and the parquet will not move. Its price per square metre depends first on one thing: the thickness that has to be made up. Here is what our 2024-2026 quotations in Savoie and Haute-Savoie show.

20-30 €
Excl. VAT/m², thin levelling layer of about 4 mm
40-75 €
Excl. VAT/m², making up as much as 20 to 30 mm
24
Quotations with a thin levelling layer priced per m²
10 %
VAT in a home over two years old

The price per m², according to the thickness to be made up

In our quotations, levelling compound is never buried in the price of the floor covering: it has its own line, priced per square metre. Two price levels emerge from them, which answer two different situations, plus a line that often accompanies them on timber floors.

Quote lineWhat it correctsPrice excl. VAT/m²Price incl. VAT/m² (VAT 10%)
Thin levelling compoundJoints of old tiles, small hollows, almost flat substrate: about 4 to 5 mm€20 to €30€22 to €33
Thick levelling compoundLevel made up by as much as 20 to 30 mm, more in places€40 to €75€44 to €83
Decoupling membraneUnder tiles laid on a timber floor, in addition to the levelling compound€25 to €35€28 to €39

On most of our 2024 quotations, the thin levelling line was at €21 excl. VAT/m². Those of 2025 and 2026 range from €21 to €30, depending on the planned average thickness (4 or 5 mm) and the condition of the substrate. Only one quotation provided for an average thickness of 10 mm, at €38 excl. VAT/m².

Thick make-up appears on five quotations from 2025 and 2026, at €40 to €75 excl. VAT/m²; four of them are at €70 or €75. One of our quotations priced one area as a lump sum, €150 excl. VAT, rather than per square metre.

What the levelling line contains

The supply and application of the mortar, poured then drawn with a smoothing trowel. Our line descriptions state the planned average thickness: it is the first point to compare between two quotations, because 4 mm and 20 mm do not cost the same.

The bonding primer, chosen according to the substrate (concrete, old tiles, timber). It makes the levelling compound adhere and prevents an overly porous substrate from soaking up the water in the mix.

The perimeter strip and the stops. A compressible strip along the walls decouples the levelling compound from the walls; timber strips delimit the levelled areas. On our thick levelling work, filling the holes and gaps in the floor is included.

What is not included: removal of the old floor covering, priced separately at €15 to €35 excl. VAT/m² in our guide to redoing your floors, and of course the floor covering laid afterwards.

Thin or thick: what decides

The thickness is decided after removal, with a straightedge laid on the substrate. An old flat tile floor whose joints merely need hiding is fine with a thin levelling layer. A floor that undulates, a sloping room or offset levels between two rooms call for a thick fibre-reinforced levelling compound, able, depending on the product, to compensate 20 to 30 mm.

Another limit counts as much as the substrate: the available height. The added thickness raises the finished floor: interior doors can be planed down, but the threshold of a French window or the first step of a staircase do not move. One of our quotations notes it room by room: the total thickness of the floor there is limited by the external joinery. This is checked before choosing the product.

Beyond the thicknesses the product allows, or to embed insulation or underfloor heating, it is no longer levelling compound but a screed. The price of a screed will be the subject of a separate guide in this series.

On old tiles, a timber floor, a slab

On old tiles, levelling compound is the most economical solution when the tiles are holding. Those that sound hollow must be removed and the area filled before the primer. For what follows, our guide to the price of laying tiles gives the cost of the floor covering itself.

On a timber floor, common in the old houses and chalets of our two départements, you need a fibre-reinforced levelling compound designed for timber substrates. The boards are first screwed down again if necessary, and the product's data sheet imposes a minimum thickness, 5 mm on a parquet floor for the product we consulted. Under tiles, we add a decoupling mat so that the movement of the timber does not reach the joints.

On a concrete slab that is flat and sound, levelling compound is not always useful. Our quotations state it in black and white: on a flat, stable floor, only a bonding primer is applied before tiling. A recent slab must, however, have reached the moisture level required by the laying rules before being covered.

Drying: the time to allow for in the schedule

Levelling compound can be walked on quickly, but it cannot be covered straight away. For a standard P3 fibre-reinforced levelling compound, the manufacturer's data sheet indicates 2 to 4 hours before it can be walked on, 8 hours before tiling and 24 hours before glued parquet or a PVC covering. It also asks for it to be covered within 8 days, once dry.

These values are measured in the laboratory at 23 °C. The same product is applied between +5 and +35 °C: in a Savoie house closed up in winter and not yet heated, drying takes longer than on the data sheet. Before parquet, we check the moisture of the substrate rather than rely on the calendar.

The P3 classification, and why it appears on our quotations

Levelling compounds carry a letter P followed by a number, which indicates the loading they withstand: P2 for lightly loaded premises, P3 for moderate loading, according to the manufacturers' data sheets. The product must be at least of the classification of the room. For houses and apartments, the descriptions of our thick levelling work specify “fibre-reinforced P3”.

Application follows the CSTB technical specifications for smoothing screeds on interior floors, one for new work, the other for renovation, as well as the data sheet of the product selected.

Two worked examples

A 25 m² living room over old flat tiles, before laminate: thin levelling compound at €20 to €30, that is €500 to €750 excl. VAT, or €550 to €825 incl. VAT.

A 12 m² bedroom over an old uneven timber floor, before tiling: thick levelling compound at €40 to €75 (€480 to €900) and decoupling mat at €25 to €35 (€300 to €420), that is €780 to €1,320 excl. VAT, or €858 to €1,452 incl. VAT.

These two budgets exclude removal of the old floor and the floor covering. Above all, they show the gap between a sound substrate and one that has to be reworked: it is the visit, not the area, that sets the right price.

What VAT applies to levelling compound?

In a home completed more than two years ago, levelling compound follows the rate of the work it prepares: 10% for a floor covering, and 5.5% if it is essential to eligible insulation work, such as insulating a lowest floor. Special cases are detailed in our guide to VAT on renovation work.

How we price levelling compound

A survey of the substrate, a thickness written on the quotation, and the same team from substrate to floor covering.

Survey of the support

Straightedge and level on the existing floor, tiles sounded, timber floor inspected: the price starts from what is measured.

Stated thickness

The quotation specifies the average thickness and the type of levelling compound, so that two proposals can be compared line by line.

Suitable primer

Concrete, old tiles or timber: each substrate receives the primer that the product data sheet calls for.

Heights checked

Thresholds, doors and the start of the staircase are checked before choosing the thickness, not discovered afterwards.

Drying respected

The drying time appears in the schedule, and moisture is measured before parquet.

Our own craftsmen

Our salaried masons, tilers and joiners, each in their own trade, carry out the substrate and the floor covering.

Where we bring floors back to level

We measure the substrate and price the levelling compound on site, throughout the area covered by our two offices.

Frequently asked questions · Levelling compound prices

What is the price of levelling compound (ragréage) per m²?
In our 2024-2026 quotations, a thin levelling layer of about 4 mm comes to €20 to €30 excl. VAT/m², or €22 to €33 incl. VAT with VAT at 10%. When 20 to 30 mm of level has to be made up, the price goes to €40 to €75 excl. VAT/m², or €44 to €83 incl. VAT. These prices include supply, the bonding primer and application.
What is the difference between levelling compound and a screed?
Levelling compound is poured in a thin layer on a substrate that is already load-bearing: from 4 to 5 mm to smooth, up to 20 or 30 mm for a thick fibre-reinforced product. A screed is a thicker element, chosen to make up a level over several centimetres or to embed insulation or underfloor heating.
Can you apply levelling compound over old tiles?
Yes, if the tiles are sound and well bonded: they are cleaned, a bonding primer is applied, then the levelling compound hides the joints. A tile that sounds hollow or is coming loose must be removed beforehand, otherwise the defect will reappear under the new floor covering.
Can you apply levelling compound to a timber floor?
Yes, with a fibre-reinforced levelling compound designed for timber substrates. The boards must first be refixed, and the product's data sheet sets a minimum thickness: 5 mm on a parquet floor for the fibre-reinforced compound we consulted. Under tiles, our quotations add a decoupling mat, at €25 to €35 excl. VAT/m².
How long should you wait before laying the floor covering?
It depends on the product, the thickness and the temperature. For a standard P3 fibre-reinforced levelling compound, the data sheet indicates 8 hours before tiling and 24 hours before glued parquet, at 23 °C. In a cold house in winter, the time gets longer: we follow the data sheet of the product laid and measure the moisture before parquet.
Is levelling compound always necessary?
No. On a floor that is already flat and stable, such as a sound concrete slab or well-bonded tiles, our quotations provide only a bonding primer before laying. Levelling compound is priced only when the survey of the substrate shows hollows, marked joints or a level defect.
A floor to bring back to level?

A flat substrate,
before any floor covering.